- Home
- Departments
- D-10
Quantity Surveying & Bill Checking
Measurement is money. We get it right.
We measure work on site, prepare and check running and final bills, and reconcile quantities against drawings and the BoQ, for owners who want to pay fairly and for contractors who want to be paid fully.
Led by Tarun Panwar, Chartered Engineer · IEI Associate Member · IBBI Registered Valuer
When to call us
Signs you need this
- A contractor bill that does not match what you see on site
- Quantities cut from your running bill
- Final bill and reconciliation pending
- Measurement book entries in dispute
- Cement and steel reconciliation needed
- A project closing with accounts still open
What we do
The work, desk by desk
Every job starts with the cause. Here is what this department covers.
Site measurement
Joint measurements recorded properly, as per IS 1200 and the contract.
Running and final bills
Prepared or checked line by line against the BoQ.
Reconciliation
Quantities, materials and cement and steel consumption reconciled.
Deviation statements
Quantity changes above and below the BoQ worked out with rates.
Bill audit for owners
An independent check before you pay.
Rates for extra items
Rates for extra and substituted items worked out the way the contract says.
What you get
In writing, every time.
Clear documents you can act on, hand to a contractor, or put in front of a department.
- Measurement sheets
- Bill with abstract
- Reconciliation statement
- Deviation statement
How it works
Four steps, starting free
- STEP 01
Free 30-minute call
Tell us what is wrong. Send photos, drawings or the contract on WhatsApp. We tell you honestly what we think.
- STEP 02
Site visit and diagnosis
An engineer inspects, measures and tests where needed. We look for the cause, not the symptom.
- STEP 03
Written report and cost
You get findings, the action plan, and a BoQ or fee in writing. No surprises later.
- STEP 04
We stay till it is done
If you want, we select the contractor, supervise the work, check the bills and close it out.
Questions
Quantity Surveying & Bill Checking: common questions
Both, but never on both sides of the same project. If there is a conflict, we tell you at the start.
First, get the measurements and the reason in writing. Then we re-check them against the drawings and IS 1200 and prepare a reasoned reply with your figures.
Related departments
Often needed together
Free & impartial advice
Your first 30 minutes are free.
Tell us what is going on. We reply on WhatsApp or by phone, and we tell you straight what we think.